How much did the Gorgon Project cost?

How much did the Gorgon Project cost?

Gorgon is one of the world’s largest LNG projects and the largest single resource project in Australia’s history at a total cost of $US55 billion.

Who owns Gorgon?

Chevron
The Chevron-operated Gorgon Project is a joint venture of the Australian subsidiaries of Chevron (47.3 percent), ExxonMobil (25 percent), Shell (25 percent), Osaka Gas (1.25 percent), Tokyo Gas (1 percent) and JERA (0.417 percent).

How many trains Gorgon LNG?

three
Gorgon’s LNG plant, one of the largest in the region, has three equal sized trains with a total nameplate capacity of 15.6 million mt/year.

What is a train in oil and gas?

An LNG train is a liquefied natural gas plant’s liquefaction and purification facility. Each LNG plant consists of one or more trains to convert natural gas into liquefied natural gas. A typical train consists of a compression area, propane condenser area, methane, and ethane areas.

When did the Gorgon project start?

December 2009
Gorgon LNG project background details “Construction on the project formally began in December 2009 and completed in March 2016, making it the fourth LNG export development in Australia.” The Gorgon gas field was discovered by West Australian Petroleum (WAPET) in 1980.

How much gas does Qatar produce?

Natural gas production in Qatar 1998-2020 In 2020, natural gas production in Qatar amounted to around 171.3 billion cubic meters. According to the source, the data represent standard cubic meters (measured at 15°C and 1,013 mbar) where possible.

What is a gas processing train?

From Wikipedia, the free encyclopedia. An LNG train is a liquefied natural gas plant’s liquefaction and purification facility. For practical and commercially viable transport of natural gas from one country to another, its volume has to be greatly reduced.

How was Barrow Island formed?

Over geological time, the land mass that became Barrow Island experienced several sea level changes connecting and separating the flora and fauna from the nearby Australian mainland. More recently, 8,000 to 10,000 years ago, rising sea levels once again separated Barrow Island from the mainland.

How many people work on the Gorgon Project?

At peak construction, the Gorgon Project directly employed more than 10,000 workers. Now in operations, our focus turns to the creation of highly skilled long-term jobs in LNG and domestic gas plant operations, maintenance and logistics support.

What is the Gorgon carbon dioxide injection project?

The Gorgon carbon dioxide injection project is an important part of the Gorgon Gas Development Project, which is developing the Greater Gorgon Area gas fields off the northwest coast of Western Australia.

What is the Gorgon LNG project?

Located on Barrow Island – a Class A Nature Reserve – Gorgon comprises a three-train, 15.6 million tonnes per annum LNG facility and a domestic gas plant with the capacity to supply 300 terajoules of gas per day to Western Australia.

How is the Gorgon project Feeding workforce?

Feeding the workforce responsible for construction of the Gorgon Project on Barrow Island is a complex logistical exercise involving long distances, tons of fresh produce and Chevron’s strict environmental quarantine standards.